(34) 93 770 47 60 [email protected]

Enagás LNG tanker loading problems

HAM Group ham advances solutions to the problems of charging tanker truck in Enagás Part of the loads will be carried out in the methane terminal of Marseille Assessing the foreseeable problems of lack of tank loading capacity during the winter period, the Enagás’...

HAM LNG Extendable mobile unit France

HAM Group designs and manufactures an extensible LNG mobile unit complying with the French standard and ISO 16924 The station allows to refuel LNG to all types of truck HAM Group has launched in France a new type of mobile LNG unit, characterized by being easily...

HAM Donation Arrels Fundació

HAM Group collaborates with Arrels Fundació No one sleeping on the street The HAM Group solidarity donations program does not stop and advances in its commitment to the most vulnerable groups in society, collaborating with an economic contribution, or equivalent...